Rhema Electric LLC, Organizational Chart and Team Experience.

President: Randy Merritt II,
Experience:
3yrs 1999-2002 Nellis Air Force Base, Las Vegas NV. While at Nellis; Randy
Remodeled US Air Force dorms $365K, offices, a medical facility $175K. Randy also completed the new construction of Area II chow hall $1.75M, office building $750K and amusement park sound system $150K.
3yrs 2002-2005 Pointer Electric Inc, Bow WA. Remodel work in chain stores and restaurants such as McDonalds and 7/11. New construction I was the project manager on the College Way Storage and Bob’s Burger & Brew. While at Pointer Electric Randy Managed $1.5-2 million dollars worth of work per year
5yrs 2006-2011 Rhema Electric Mount Vernon WA. Founder of Rhema Electric LLC Randy has built a great business in a short amount of time. By hiring people specialized in each part of the business and developing strong relationships with returning customers Rhema Electric is a force of 16-20 men trained through IEC apprenticeship and inspired with profit sharing incentive. We manage to aggressively manage our jobs on time and with profit all the while giving the customer the experience they deserve.

Estimator: Steve Vanderworf,
Experience:
12yrs 1988-2000 as a CAD operator for Engineers North West, Taking engineers rough drawings and refining them to customer ready sets.
4yrs 2000-2004 Valley Electric, at Valley Electric Steve was a CAD operator, Estimator and Project Manager. While at Valley Electric Steve worked as a Project Engineer with a lead PM overseeing around $7million a year. Some of the projects at Valley Electric Included Paine Field Air Craft Tower 1.4million, Anacortes Ferry Terminal Loading Ramp $1.2million and Shaw Island Ferry Loading Ramp $250K
4yrs 2004-2008 Dahl’s Valley Electric, at Dahl’s Steve was an Estimator/ Project Manager. While estimating Steve averaged $3-4 Million dollars a year in winning bids. Through out his stay there he managed several projects as a Project Manager. These projects included WWU Bond Hall $30k, WWU Ridgway (Student Housing.) $250k and WWU Shannon Point Biology Library $450k.
3yrs 2008-Current; Rhema Electric, Estimator/ Project Manager. At Rhema Electric Steve’s main focus is estimating. Steve can be called upon to competently assist our Project managers when needed.



Project Manager: Brandon Axthelm
Experience:
4yr Degree as a Construction Management Engineer from Central Washington University.
4yrs 1995-1999 BFC Frontier Construction, Inc. (Aecon), Lynnwood, WA Contract award, project buyout, submittal and shop drawing review, conduct project coordination meetings, meeting minutes, compile and submit changes to the contracts, compile and submit billings. Work with Sr. Project Managers for successful projects. Northwest Composites, Aerospace Manufacturing Facility, Marysville, WA $10M, Yakima Indian Nation Casino, Toppenish, WA. $9.9M Interior TI to Muckleshoot Casino, Auburn, WA $500K, Renovation of Factoria Square Mall, Bellevue, WA $750K, Nordstrom Rack Shell, Bellevue, WA $5.5M, Pickering Square Shopping Center, Issaquah, WA $7.2M, Muckleshoot Casino, Auburn, WA $11.1M
2yrs 1999-2000 Axthelm Construction, Inc., Mt. Vernon, WA Procure projects, design, estimate, secure contracts and manage projects through project closeout. Daily operations of the company. Addition to International Aero, Inc., Burlington, WA$1.8M Dri-Eaz Products, Burlington, WA $3M, Achilles USA, Everett, WA $150K, Facility Upgrades to Summit Timber, Darrington, WA $125K
3yrs 2000-2003 Ledcor Industries, Inc., Mercer Island, WA Project management and on site coordination, estimating, buy-out, secure subcontracts, submittal and shop drawing review, subcontractor and owner change orders, billings and conduct both owner and project coordination meetings. Costco Wholesale, San Juan Puerto Rico. $16M, 360networks, inc., Telecommunications, OSS, NOC and Office Facility, Broomfield (Denver) CO.$14M, Assist in several other projects at the Mercer Island Office.
2yrs 2003-2005 Rushforth Construction, Inc., Tacoma, WA Project management, buy-out, secure subcontracts, submittal and shop drawing review and on site coordination. Work with superintendents and project managers to manage projects through projects closeout. Vineyard Park Assisted Living, Bothell, WA 8.9M, Interstate Distributors, Puyallup WA $14M
4yrs 2005 -2009 Axthelm Construction, Inc., Mount Vernon, WA. Brandon’s job was to procure leads, design buildings, estimate, secure contracts, establish and maintain relationships with owners, manage, analyze, forecast and maintain project budgets and schedule through closeout. Monitor safety regulations on all projects.
Washington National Guard , Bellingham WA $800K, Valley RV & Marine, Mount Vernon, WA $1.5M, Twin City Foods, Arlington WA $250K, ABC Rentals, Mukilteo, WA $1.6M, Hampton Lumber, Planner Mill, Darrington, WA $75K, Bob’s Burgers & Brew, Tulalip, WA $2.6M, Work source Building, Mount Vernon, WA $3.2M, Hawthorne Funeral Home, Mount Vernon, WA $450K, College Way Storage, Mount Vernon, WA $2.5M, Commonwealth Engineering T.I., Mount Vernon, WA $176K
Puget Sound Energy Fiber-Optic, Baker Lake Dam, WA $250K



  • Office: Sandy Sherman
    Experience:
    12 Years Contract Administration, at Seahurst Electric as well as with Service Electric Sandy was the Office Manager, including handling contracts, Payrolls, submittals and O&Ms making sure all contract documents were handled properly. While with Seahurst, Sandy was Project Engineer on the 10M new Snohomish High School Project.


    Here are Some of Our Recent Projects Recent Projects/Contractor/Price and Date Completed
  • Skagit Valley Hospital Mental Health, Hanson Brothers Construction $620K Completed 4/01/2012
  • Shorecrest High School, Spee West Construction 6.3M to be Completed August 2013
  • Regus TI World Trade Center, JMS Construction 122K Completed 11/01/2011
  • US Healthworks Redmond, JMS Construction 136K Completed 08/1/2011
  • Centinnial Middle School Spee West Construction 1.7M to be Completed November 2011
  • Oak Harbor High School Maintenance and Feilds Allied Construction $748K completed July 2011
  • Jefferson Elementary School remodel Everett School District Graham Construction 1,600,000.00 completed March 2011
  • Lake Tyee Campground
    Lake Tyee Owners Association Potelco Construction 1,120,000.00 Phase 1 of 3 Complete
  • Snohomish Freshman Campus Snohomish High School Van Roosen 425-525-3446 $180,000.00 8/21/2009
  • Mariner Fire Station Snohomish Fire District Advanced Construction 425-493-1826 $191,568.00 8/27/2009
  • Tarro Theatre Remodel Skagit Valley College Roosendaal-Honcoop 360-398-2800 $142,000.00 3/12/2009
  • Intertribal Storage Facility Tulalip Tribes Tulalip Construction 425-754-0364 $342,996.00 2/28/2009
  • 164th Street Crossing Building #6 ADB Holdings Generation Construction 253-804-0999 $95,606.00 1/15/2009
  • Bellingham Readiness Center Washington National Guard Axthelm Construction 360-424-9048 $102,307.00 1/2/2009
  • ABC Rental Addition ABC Rentals Axthelm Construction 360-424-9048 $60,145.00 10/3/2008
  • Tulalip Data Center Tulalip Tribes Tulalip Construction 425-754-0364 $830,568.00 3/31/2008

    Our Bonding is handled by Steve Palmer of Kibble & Prentice (206) 695-3102

    Our Insurance is handled by Tanya Sanger at Federated (360) 305-6439